#5 PADDINGTON

DSC_0006.jpg

As you can see this build has progressed enormously, the structure is well & truly up with the roof on. You can see how much space has been gained by using the full width of the house for the new kitchen / living area. There will be a small downstairs bathroom, the main bathroom being located upstairs above the kitchen. The pitch of the skillion roof & the width of the upstairs has been kept in proportion to all of the other houses in the street, to comply with council heritage requirements.

DSC_0009.jpg

The upstairs / main bathroom will be where you can see the concrete sheeting, a built in robe will be on the other side of the bathroom wall working as a sound barrier. The room is filled with light & has a juliette balcony overlooking the garden.

Next visit will see the downstairs floor joists in position & a lot more detailed joinery work taking place.

www.johnnormyledesign.com

 

Share on FacebookPin on Pinterest

Leave a Reply

Your email address will not be published. Required fields are marked *